Chemical leak in ºÚ°µ±¬ÁÏÍø Engineering Building is contained
December 14, 2015
POCATELLO – A chemical leak in the ºÚ°µ±¬ÁÏÍø Engineering Building that occurred about 11:30 a.m. Monday, Dec. 14, has been contained and the building has been re-opened.
A student lab assistant and a staff member were working with the chemical boron trifluoride when a release occurred. The chemical was immediately contained. As a precaution, the student and lab assistant were transported via private vehicle to the Portneuf Medical Center for observation, according to Phillip Moessner, ºÚ°µ±¬ÁÏÍø associated vice president of facilities services. The student and lab assistant were evaluated and released.
ºÚ°µ±¬ÁÏÍø emergency personnel, including the Office of Technical Safety, the Pocatello Fire Department, the Pocatello Police Department and a regional hazardous materials team responded to the incident.
Students will be notified if the location for their final exams has been changed.
Categories: